Remove portions of existing slab within repair area to indicated depth. Install new reinforced topping slab. Alternate #1: Encase three (3) steel columns in concrete. Transfer station shall remain open and operational during the work; therefore, all work needs to be phased accordingly. ***DO NOT SUBMIT BIDS ELECTRONICALLY***