The project consists of:
the removal & disposal of one (1) 4,000-gallon single wall fiberglass reinforced concrete
underground fuel oil tank in front of the airport terminal building including the installation of a
temporary 2,000-gallon rectangular aboveground fuel oil tank with connections to the terminal
buildings existing boiler system. The project also includes the removal, disposal and replacement
of a 1,000-gallon oil/water separator at the airport''s maintenance facility.
The contract time for completion of all work is within one hundred (100) calendar days from the
date specified in the "Notice to Proceed".