Baton Rouge Terminal Interior Upgrades ***There will be a Mandatory Pre-Bid Conference and Site Visit held on April 23, 2026, at 11:00 a.m. in the 1st floor conference room at the Baton Rouge Metropolitan Airport Terminal Building.*** | Procurely
Founding member — 2 months free
This is one of 10,300+ active opportunities on Procurely
Track federal, state, and local contracts. Score your bids, draft AI proposals, and manage your pipeline — all in one place.
Bid
Active
Construction
Baton Rouge Terminal Interior Upgrades ***There will be a Mandatory Pre-Bid Conference and Site Visit held on April 23, 2026, at 11:00 a.m. in the 1st floor conference room at the Baton Rouge Metropolitan Airport Terminal Building.***
There will be a Mandatory Pre-Bid Conference and Site Visit held on April 23, 2026, at 11:00 a.m. in the 1st floor conference room at the Baton Rouge Metropolitan Airport Terminal Building. | Department: GREATER BR AIRPORT DISTRICT